parts arrived; assembly ongoing

2022-11-12

been slowly building, a few pieces in the full rack still todo. must tighten all the screws, add the last screw in the corner, then setup all the rails, then setup the larger drive bays and full switches, the half switches can go up high. there is a diagram for it. the quarter rack upstairs for just drives isn't built at all, on hold for now.